Covid 19 Phase two of re-opening And Commodores Newsletter

Covid 19 Phase two of re-opening

And Commodores newsletter

 

Dear all

It is with great pleasure that I can tell you, Glencoe Boat Club is to open again on the 10 of July 2020.www.gov.scot/news/further-route-map-detail-announced

There are still rules that need to be pointed out:

Club house: only two families are allowed in the clubhouse at any one time with social distancing of two metres, all surfaces touched to be disinfected before leaving and wash hands before you go in at the temporary wash sink outside the club door, bring your own disinfectant and toilet roll to use and be especially diligent in the toilets.

Always keep two metres away from each other outside.

(Use your common sense) The virus has not gone away and we do not want to see it return.

 

Newsletter

 

With everyone forced into lockdown for the past few months the club has had to rely on local folk to look after the club.

There have been three people that have stood out in my opinion and that is Angus McInnes who has secured floats for the pontoons that were gradually sinking due to getting punctured and old age, they are being replaced as I speak on the three pontoons that were also damaged in the winter storms with the help of Ruairidh MacLellan and Kevin Boyle, (also been sourced) is a matting that will be placed onto the ground where the pontoons come into contact with the tide before the pontoons can be reinstated with the help of a machine to lift the heavy walkway back onto the pontoon and Kevin replacing the securing mechanism, there is also chain being replaced on the pontoons securing.

Kevin and Angus have also sourced a boat to use for the purpose of diving the moorings which is happening in a couple of weeks, (diver booked) and Kevin has repaired the engine for said boat.

So, without these local heroes our club would not be ready for opening so soon. A big thank you from me to the three of them.

I look forward to seeing you all soon.

Colin Haste (Commodore).

Covid-19 (Phase one) of reopening

Glencoe Boat Club

 

Covid-19 (Phase one) of reopening

 

Dear all

With a lot of communication over the weekend with your committee I have decided that the club remains closed in this phase and reviewed as the phases change.

The right to exercise by sailing can be done in phase one with your own boat from your mooring as long as you do not use the clubhouse and you live in a reasonable area of the locality, ( 5 miles being the Governments guide) please use the top carpark and the old slipway for your dinghy launching and stay 2mts away from different household’s as per the Government Guidance and the RYA links here https://www.rya.org.uk/scotland/representation/Pages/Return-to-Boating.aspx

https://www.rya.org.uk/scotland/representation/Documents/RYA%20Scotland%20General%20Guidance%20for%20boating%20activity%20for%20Phase%201.pdf

The pontoons are being repaired; they will not be installed until completed.

I have been in touch with the diver and found two possibilities for the dive boat and driver, all is being arranged just now and awaiting confirmation , so the members that have paid for their moorings this year will have their moorings inspected as soon as possible.

I will update you with information regarding the slow and cautious re-opening of the club (as health and safety mustcome before any changes are made) when I know the answers.

Your Commodore

Colin Haste